{"id":7307,"date":"2023-12-14T22:08:47","date_gmt":"2023-12-14T22:08:47","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=7307"},"modified":"2023-12-14T22:08:47","modified_gmt":"2023-12-14T22:08:47","slug":"12-20-1-5-flagging-operations-on-26th-st-from-campus-way-to-monroe-ave","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/12\/14\/12-20-1-5-flagging-operations-on-26th-st-from-campus-way-to-monroe-ave\/","title":{"rendered":"12\/20 &#8211; 1\/5: Flagging Operations on 26th St. from Campus Way to Monroe Ave."},"content":{"rendered":"\n<p>As part of early construction work related to the <a href=\"https:\/\/fa.oregonstate.edu\/project-delivery\/jen-hsun-lori-huang-collaborative-innovation-complex\" target=\"_blank\" rel=\"noreferrer noopener\">Jen-Hsun &amp; Lori Huang Collaborative Innovation Complex<\/a> project, there will be intermittent flagging operations along SW 26<sup>th<\/sup> St. between SW Campus Way and NW Monroe Ave <strong>from Wednesday, December 20 through Friday, January 5. <\/strong>Flaggers will direct drivers, bicyclists and pedestrians through the construction zone.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"7308\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/12\/14\/12-20-1-5-flagging-operations-on-26th-st-from-campus-way-to-monroe-ave\/12-20-cic-26th-st-flagging\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?fit=1216%2C837&amp;ssl=1\" data-orig-size=\"1216,837\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"12.20-CIC-26th-St-Flagging\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?fit=770%2C530&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?resize=768%2C529&#038;ssl=1\" alt=\"The map shows a construction zone and flagging area on SW 26th St. between SW Campus Way and NW Monroe Ave. \" class=\"wp-image-7308\" width=\"768\" height=\"529\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?resize=1024%2C705&amp;ssl=1 1024w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?resize=300%2C206&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?resize=768%2C529&amp;ssl=1 768w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/12\/12.20-CIC-26th-St-Flagging.jpg?w=1216&amp;ssl=1 1216w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Construction Manager <a href=\"mailto:Lundy,%20Jason%20P%20%3cJason.Lundy@oregonstate.edu%3e\" target=\"_blank\" rel=\"noreferrer noopener\">Jason Lundy<\/a> at (541) 270-0193.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of early construction work related to the Jen-Hsun &amp; Lori Huang Collaborative Innovation Complex project, there will be intermittent flagging operations along SW 26th St. between SW Campus Way and NW Monroe Ave from Wednesday, December 20 through Friday, January 5. Flaggers will direct drivers, bicyclists and pedestrians through the construction zone. For&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/12\/14\/12-20-1-5-flagging-operations-on-26th-st-from-campus-way-to-monroe-ave\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":13074,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-7307","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/7307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/13074"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=7307"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/7307\/revisions"}],"predecessor-version":[{"id":7316,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/7307\/revisions\/7316"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=7307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=7307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=7307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}