{"id":6998,"date":"2023-09-05T23:12:08","date_gmt":"2023-09-05T23:12:08","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=6998"},"modified":"2023-09-05T23:12:08","modified_gmt":"2023-09-05T23:12:08","slug":"9-7-9-8-campus-way-closed-between-26th-st-memorial-place","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/09\/05\/9-7-9-8-campus-way-closed-between-26th-st-memorial-place\/","title":{"rendered":"9\/7-9\/8: Campus Way CLOSED Between 26th St. &amp; Memorial Place"},"content":{"rendered":"\n<p>As part of the Kelley District Utility Plant project, SW Campus Way will be closed between SW 26<sup>th<\/sup> St. and SW Memorial Place <strong>on Thursday, September 7 and Friday, September 8<\/strong> to allow for crane activity. The south entrance to Kelley Engineering Center will also be closed.<\/p>\n\n\n\n<p>The north sidewalk on Campus Way will be closed between 26<sup>th<\/sup> St. and Memorial Place. The south sidewalk will remain open.<\/p>\n\n\n\n<p>Other possible impacts include noise near the work site.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"506\" data-attachment-id=\"6999\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/09\/05\/9-7-9-8-campus-way-closed-between-26th-st-memorial-place\/9-7-kdup-campus-way-closure\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?fit=1121%2C737&amp;ssl=1\" data-orig-size=\"1121,737\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1693928173&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"9.7-KDUP-Campus-Way-Closure-\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?fit=770%2C506&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?resize=770%2C506&#038;ssl=1\" alt=\"The map shows a road closure on SW Campus Way between SW 26th St. and SW Memorial Place. \" class=\"wp-image-6999\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?resize=1024%2C673&amp;ssl=1 1024w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?resize=300%2C197&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?resize=768%2C505&amp;ssl=1 768w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/09\/9.7-KDUP-Campus-Way-Closure-.jpg?w=1121&amp;ssl=1 1121w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Construction Manager <a href=\"mailto:Fuszek,%20Justin%20Lang%20%3cJustin.Fuszek@oregonstate.edu%3e\" target=\"_blank\" rel=\"noreferrer noopener\">Justin Fuszek<\/a> at (541) 740-5260.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the Kelley District Utility Plant project, SW Campus Way will be closed between SW 26th St. and SW Memorial Place on Thursday, September 7 and Friday, September 8 to allow for crane activity. The south entrance to Kelley Engineering Center will also be closed. The north sidewalk on Campus Way will be&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/09\/05\/9-7-9-8-campus-way-closed-between-26th-st-memorial-place\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":13074,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1291490,655984,656006,1291417,211864],"tags":[],"class_list":["post-6998","post","type-post","status-publish","format-standard","hentry","category-campus-way","category-crane-set","category-kelley-engineering-center","category-road-closure","category-sidewalk-closure"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/13074"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=6998"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6998\/revisions"}],"predecessor-version":[{"id":7000,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6998\/revisions\/7000"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=6998"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=6998"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=6998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}