{"id":6855,"date":"2023-07-28T15:49:20","date_gmt":"2023-07-28T15:49:20","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=6855"},"modified":"2023-07-28T15:49:20","modified_gmt":"2023-07-28T15:49:20","slug":"8-10-8-11-2023-sw-26th-street-closure-for-restriping","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/07\/28\/8-10-8-11-2023-sw-26th-street-closure-for-restriping\/","title":{"rendered":"8\/10-8\/11\/2023: SW 26th Street closure for restriping"},"content":{"rendered":"\n<p>As part of the <a href=\"https:\/\/fa.oregonstate.edu\/oregon-state-university-transportation-plan-corvallis-campus\">Pedestrian\/Bicycle Priority Zone project<\/a> \u2013 Phase 1, SW 26<sup>th<\/sup> Street will be closed for restriping between SW Jefferson Way and SW Campus Way and between SW Campus way and NW Orchard Ave. The ADA and service parking spots along SW 26<sup>th<\/sup> Street bordering the MU Quad will be closed. Sidewalk access will be open and east\/west access on SW Campus and SW Jefferson Ways will be open. The closure will occur August 10 and August 11.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/07\/Campus-Core68-copy.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"467\" height=\"310\" data-attachment-id=\"6854\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/campus-core68-copy\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/07\/Campus-Core68-copy.jpg?fit=467%2C310&amp;ssl=1\" data-orig-size=\"467,310\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Campus Core[68] copy\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/07\/Campus-Core68-copy.jpg?fit=467%2C310&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/07\/Campus-Core68-copy.jpg?resize=467%2C310&#038;ssl=1\" alt=\"SW 26th Street closed for restriping August 10-11\" class=\"wp-image-6854\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/07\/Campus-Core68-copy.jpg?w=467&amp;ssl=1 467w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/07\/Campus-Core68-copy.jpg?resize=300%2C199&amp;ssl=1 300w\" sizes=\"auto, (max-width: 467px) 100vw, 467px\" \/><\/a><\/figure>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Project Manager\u00a0<a href=\"mailto:mailto:Justin.Fuszek@oregonstate.edu\">Aaron Amoth\u00a0<\/a>at 541-207-5084.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the Pedestrian\/Bicycle Priority Zone project \u2013 Phase 1, SW 26th Street will be closed for restriping between SW Jefferson Way and SW Campus Way and between SW Campus way and NW Orchard Ave. The ADA and service parking spots along SW 26th Street bordering the MU Quad will be closed. Sidewalk access&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/07\/28\/8-10-8-11-2023-sw-26th-street-closure-for-restriping\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3122,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1291417],"tags":[],"class_list":["post-6855","post","type-post","status-publish","format-standard","hentry","category-road-closure"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/3122"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=6855"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6855\/revisions"}],"predecessor-version":[{"id":6856,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6855\/revisions\/6856"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=6855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=6855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=6855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}