{"id":6637,"date":"2023-06-21T18:43:32","date_gmt":"2023-06-21T18:43:32","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=6637"},"modified":"2023-06-21T18:43:32","modified_gmt":"2023-06-21T18:43:32","slug":"6-26-sidewalk-closed-between-kelley-engineering-center-plageman-student-health-center","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/06\/21\/6-26-sidewalk-closed-between-kelley-engineering-center-plageman-student-health-center\/","title":{"rendered":"6\/26: Sidewalk CLOSED Between Kelley Engineering Center &amp; Plageman Student Health Center"},"content":{"rendered":"\n<p>As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed <strong><u>on Monday, June 26 from 6 A.M. to 6 P.M.<\/u><\/strong> Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"438\" data-attachment-id=\"6638\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/06\/21\/6-26-sidewalk-closed-between-kelley-engineering-center-plageman-student-health-center\/6-19-kelley-sidewalk-closure-1\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?fit=1158%2C658&amp;ssl=1\" data-orig-size=\"1158,658\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"6.19-Kelley-sidewalk-closure-1\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?fit=770%2C438&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?resize=770%2C438&#038;ssl=1\" alt=\"The image shows a sidewalk closure on the north side of the Kelley Engineering Center, between Kelley Engineering and the Plageman Student Health Center. \" class=\"wp-image-6638\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?resize=1024%2C582&amp;ssl=1 1024w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?resize=300%2C170&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?resize=768%2C436&amp;ssl=1 768w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2023\/06\/6.19-Kelley-sidewalk-closure-1.jpg?w=1158&amp;ssl=1 1158w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Construction Manager <a href=\"mailto:Fuszek,%20Justin%20Lang%20%3cJustin.Fuszek@oregonstate.edu%3e\" target=\"_blank\" rel=\"noreferrer noopener\">Justin Fuszek<\/a> at (541) 740-5260.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Monday, June 26 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2023\/06\/21\/6-26-sidewalk-closed-between-kelley-engineering-center-plageman-student-health-center\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":13074,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[656006,656018,211864],"tags":[],"class_list":["post-6637","post","type-post","status-publish","format-standard","hentry","category-kelley-engineering-center","category-plageman-student-health-center","category-sidewalk-closure"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6637","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/13074"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=6637"}],"version-history":[{"count":2,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6637\/revisions"}],"predecessor-version":[{"id":6640,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/6637\/revisions\/6640"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=6637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=6637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=6637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}