{"id":5657,"date":"2022-01-04T23:08:53","date_gmt":"2022-01-04T23:08:53","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=5657"},"modified":"2022-01-04T23:08:53","modified_gmt":"2022-01-04T23:08:53","slug":"1-5-2-25-2022-planned-elevator-shutdown-for-rogers-hall","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2022\/01\/04\/1-5-2-25-2022-planned-elevator-shutdown-for-rogers-hall\/","title":{"rendered":"1\/5-2\/25\/2022: Planned elevator shutdown for Rogers Hall"},"content":{"rendered":"\n<p>A planned shutdown for the elevator located in Rogers Hall is scheduled to start on Wednesday, January 5, 2022 through Friday, February 25, 2022. Renovation work will be performed during the shutdown. Impacted buildings include Rogers Hall, Graf Hall and Dearborn Hall.<\/p>\n\n\n\n<p>For questions or comments on this closure, contact Project Manager\u00a0<a href=\"mailto:david.amundson@oregonstate.edu\">David Amundson<\/a>\u00a0at 541-737-2760.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2022\/01\/Rogers-Hall-area-map.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"572\" data-attachment-id=\"5658\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2022\/01\/04\/1-5-2-25-2022-planned-elevator-shutdown-for-rogers-hall\/rogers-hall-area-map\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2022\/01\/Rogers-Hall-area-map.png?fit=915%2C680&amp;ssl=1\" data-orig-size=\"915,680\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"Rogers-Hall-area-map\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2022\/01\/Rogers-Hall-area-map.png?fit=770%2C572&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2022\/01\/Rogers-Hall-area-map.png?resize=770%2C572&#038;ssl=1\" alt=\"Rogers Hall area map\" class=\"wp-image-5658\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2022\/01\/Rogers-Hall-area-map.png?w=915&amp;ssl=1 915w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2022\/01\/Rogers-Hall-area-map.png?resize=300%2C223&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2022\/01\/Rogers-Hall-area-map.png?resize=768%2C571&amp;ssl=1 768w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A planned shutdown for the elevator located in Rogers Hall is scheduled to start on Wednesday, January 5, 2022 through Friday, February 25, 2022. Renovation work will be performed during the shutdown. Impacted buildings include Rogers Hall, Graf Hall and Dearborn Hall. For questions or comments on this closure, contact Project Manager\u00a0David Amundson\u00a0at 541-737-2760.<\/p>\n","protected":false},"author":9928,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[655997,211860,1291454,656020],"tags":[],"class_list":["post-5657","post","type-post","status-publish","format-standard","hentry","category-dearborn-hall","category-elevator-shutdowns","category-graf-hall","category-rogers-hall"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5657","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/9928"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=5657"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5657\/revisions"}],"predecessor-version":[{"id":5659,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5657\/revisions\/5659"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=5657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=5657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=5657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}