{"id":5374,"date":"2021-07-09T00:03:46","date_gmt":"2021-07-09T00:03:46","guid":{"rendered":"https:\/\/blogs.oregonstate.edu\/closurenotices\/?p=5374"},"modified":"2021-07-09T00:03:52","modified_gmt":"2021-07-09T00:03:52","slug":"7-13-7-15-2021-lift-set-up-for-milam-hall-roof-work","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2021\/07\/09\/7-13-7-15-2021-lift-set-up-for-milam-hall-roof-work\/","title":{"rendered":"7\/13-7\/15\/2021: Lift set up for Milam Hall roof work"},"content":{"rendered":"\n<p>As part of the\u00a0Milam Hall re-roofing project,\u00a0a lift will be set up adjacent to Milam Hall to gain access to the roof for material testing. Work is scheduled to start on Tuesday, July 13, 2021 through Friday, July 15, 2021.<\/p>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Infrastructure Project Manager\u00a0<a href=\"mailto:aaron.collett@oregonstate.edu\">Aaron\u00a0Collett<\/a>\u00a0at 541-207-2780.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/04\/Milam-Hall-area-map.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"356\" data-attachment-id=\"5223\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2021\/04\/13\/4-15-2021-lift-accessing-milam-hall-roof\/milam-hall-area-map\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/04\/Milam-Hall-area-map.png?fit=828%2C383&amp;ssl=1\" data-orig-size=\"828,383\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"Milam-Hall-area-map\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/04\/Milam-Hall-area-map.png?fit=770%2C356&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/04\/Milam-Hall-area-map.png?resize=770%2C356&#038;ssl=1\" alt=\"Milam Hall lift area map\" class=\"wp-image-5223\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/04\/Milam-Hall-area-map.png?w=828&amp;ssl=1 828w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/04\/Milam-Hall-area-map.png?resize=300%2C139&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/04\/Milam-Hall-area-map.png?resize=768%2C355&amp;ssl=1 768w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>As part of the\u00a0Milam Hall re-roofing project,\u00a0a lift will be set up adjacent to Milam Hall to gain access to the roof for material testing. Work is scheduled to start on Tuesday, July 13, 2021 through Friday, July 15, 2021. For questions or comments on this closure, contact\u00a0Infrastructure Project Manager\u00a0Aaron\u00a0Collett\u00a0at 541-207-2780.<\/p>\n","protected":false},"author":9928,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3353,656013,1291447],"tags":[],"class_list":["post-5374","post","type-post","status-publish","format-standard","hentry","category-buildings","category-milam-hall","category-roof-work"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/9928"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=5374"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5374\/revisions"}],"predecessor-version":[{"id":5375,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5374\/revisions\/5375"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=5374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=5374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=5374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}