{"id":5293,"date":"2021-05-25T18:49:07","date_gmt":"2021-05-25T18:49:07","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/closurenotices\/?p=5293"},"modified":"2021-05-25T21:10:43","modified_gmt":"2021-05-25T21:10:43","slug":"3-26-3-28-2021-partial-lane-closure-of-campus-way","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2021\/05\/25\/3-26-3-28-2021-partial-lane-closure-of-campus-way\/","title":{"rendered":"5\/26-5\/28\/2021: Partial lane closure of Campus Way"},"content":{"rendered":"\n<p>As part of the Owen Hall Renovation Project, Campus Way in front of Owen Hall will be narrowed by 12 feet for a concrete pump and concrete truck. There will be a 8-10 foot lane that will remain open. Work is scheduled to take place between 5 a.m. and 8 a.m. daily, starting on Wednesday, May 26, and again on Friday, May 28, 2021.<\/p>\n\n\n\n<p>For questions or comments on this closure, contact&nbsp;Project Manager <a href=\"mailto:john.doty@oregonstate.edu\">John Doty<\/a> at 541-740-8302 or Construction Manager <a href=\"mailto:david.amundson@oregonstate.edu\">David Amundson<\/a> at 541-737-2760.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/05\/Campus-Way-partial-lane-closure.png?ssl=1\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"603\" data-attachment-id=\"5294\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2021\/05\/25\/3-26-3-28-2021-partial-lane-closure-of-campus-way\/campus-way-partial-lane-closure\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/05\/Campus-Way-partial-lane-closure.png?fit=868%2C680&amp;ssl=1\" data-orig-size=\"868,680\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"Campus-Way-partial-lane-closure\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/05\/Campus-Way-partial-lane-closure.png?fit=770%2C603&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/05\/Campus-Way-partial-lane-closure.png?resize=770%2C603&#038;ssl=1\" alt=\"Campus Way area map\" class=\"wp-image-5294\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/05\/Campus-Way-partial-lane-closure.png?w=868&amp;ssl=1 868w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/05\/Campus-Way-partial-lane-closure.png?resize=300%2C235&amp;ssl=1 300w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2021\/05\/Campus-Way-partial-lane-closure.png?resize=768%2C602&amp;ssl=1 768w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>As part of the Owen Hall Renovation Project, Campus Way in front of Owen Hall will be narrowed by 12 feet for a concrete pump and concrete truck. There will be a 8-10 foot lane that will remain open. Work is scheduled to take place between 5 a.m. and 8 a.m. daily, starting on Wednesday,&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2021\/05\/25\/3-26-3-28-2021-partial-lane-closure-of-campus-way\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9928,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3353,1291435,1291402,1291417,1291444,211875],"tags":[],"class_list":["post-5293","post","type-post","status-publish","format-standard","hentry","category-buildings","category-concrete-work","category-owen-hall","category-road-closure","category-roadway-impact","category-walkway-closure"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/9928"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=5293"}],"version-history":[{"count":2,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5293\/revisions"}],"predecessor-version":[{"id":5296,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/5293\/revisions\/5296"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=5293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=5293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=5293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}