{"id":4989,"date":"2020-09-25T00:27:24","date_gmt":"2020-09-25T00:27:24","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/closurenotices\/?p=4989"},"modified":"2020-09-25T00:27:31","modified_gmt":"2020-09-25T00:27:31","slug":"9-28-2020-research-way-lab-building-fire-sprinkler-system-shutdown","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/09\/25\/9-28-2020-research-way-lab-building-fire-sprinkler-system-shutdown\/","title":{"rendered":"9\/28\/2020: Research Way Lab Building fire sprinkler system shutdown"},"content":{"rendered":"\n<p>As part of the\u00a0Research\u00a0Way\u00a0Lab\u00a0Building\u00a0Renovation Project, the fire sprinkler system at the Research Way Lab Building needs to be shutdown to repair a leaking sprinkler head on the second\u00a0floor in Open Office area room #2180. The location of the work is toward the west end of 2180 and will not impact any of the offices or office cubicles.<\/p>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Project Manager\u00a0<a href=\"mailto:john.doty@oregonstate.edu\">John Doty<\/a>\u00a0at 541-740-8302 or\u00a0Construction Manager\u00a0<a href=\"mailto:Amy.Keene@oregonstate.edu\">Amy Keene<\/a>\u00a0at 541-214-1038.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"734\" height=\"584\" data-attachment-id=\"4806\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/06\/25\/7-1-2020-research-way-lab-building-crane-work\/researchwaymap_crane\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap_crane.png?fit=734%2C584&amp;ssl=1\" data-orig-size=\"734,584\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"researchwaymap_crane\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap_crane.png?fit=734%2C584&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap_crane.png?resize=734%2C584&#038;ssl=1\" alt=\"Research Way Lab Building area map\" class=\"wp-image-4806\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap_crane.png?w=734&amp;ssl=1 734w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap_crane.png?resize=300%2C239&amp;ssl=1 300w\" sizes=\"auto, (max-width: 734px) 100vw, 734px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>As part of the\u00a0Research\u00a0Way\u00a0Lab\u00a0Building\u00a0Renovation Project, the fire sprinkler system at the Research Way Lab Building needs to be shutdown to repair a leaking sprinkler head on the second\u00a0floor in Open Office area room #2180. The location of the work is toward the west end of 2180 and will not impact any of the offices or&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/09\/25\/9-28-2020-research-way-lab-building-fire-sprinkler-system-shutdown\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9928,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3353,1291418,1291407],"tags":[],"class_list":["post-4989","post","type-post","status-publish","format-standard","hentry","category-buildings","category-fire-suppression-system","category-research-way-lab-building"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/9928"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=4989"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4989\/revisions"}],"predecessor-version":[{"id":4990,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4989\/revisions\/4990"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=4989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=4989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=4989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}