{"id":4940,"date":"2020-08-19T00:43:04","date_gmt":"2020-08-19T00:43:04","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/closurenotices\/?p=4940"},"modified":"2020-08-19T00:43:10","modified_gmt":"2020-08-19T00:43:10","slug":"8-22-2020-planned-electrical-shutdown-for-oak-creek-building","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/08\/19\/8-22-2020-planned-electrical-shutdown-for-oak-creek-building\/","title":{"rendered":"8\/22\/2020: Planned electrical shutdown for Oak Creek Building"},"content":{"rendered":"\n<p>As part of the\u00a0Oak Creek HVAC Project, a planned electrical shutdown is scheduled for the Oak Creek Building. The electrical shutdown is scheduled for Saturday, Aug. 22, 2020 from 7 a.m. to 11 a.m. Identified equipment that needs temporary power during the outage has been coordinated with the contractor and will be picked up by a generator. \u00a0<\/p>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Construction Manager\u00a0<a href=\"mailto:Jason.Lundy@oregonstate.edu\">Jason\u00a0Lundy<\/a>\u00a0at 541-270-0193.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"741\" height=\"683\" data-attachment-id=\"4941\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/08\/19\/8-22-2020-planned-electrical-shutdown-for-oak-creek-building\/oak-creek-building-area-map\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/08\/Oak-Creek-Building-area-map.png?fit=741%2C683&amp;ssl=1\" data-orig-size=\"741,683\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"Oak-Creek-Building-area-map\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/08\/Oak-Creek-Building-area-map.png?fit=741%2C683&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/08\/Oak-Creek-Building-area-map.png?resize=741%2C683&#038;ssl=1\" alt=\"Oak Creek Building area map\" class=\"wp-image-4941\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/08\/Oak-Creek-Building-area-map.png?w=741&amp;ssl=1 741w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/08\/Oak-Creek-Building-area-map.png?resize=300%2C277&amp;ssl=1 300w\" sizes=\"auto, (max-width: 741px) 100vw, 741px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>As part of the\u00a0Oak Creek HVAC Project, a planned electrical shutdown is scheduled for the Oak Creek Building. The electrical shutdown is scheduled for Saturday, Aug. 22, 2020 from 7 a.m. to 11 a.m. Identified equipment that needs temporary power during the outage has been coordinated with the contractor and will be picked up by&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/08\/19\/8-22-2020-planned-electrical-shutdown-for-oak-creek-building\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":9928,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3353,211855,656016],"tags":[],"class_list":["post-4940","post","type-post","status-publish","format-standard","hentry","category-buildings","category-shutdown","category-oak-creek-building"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/9928"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=4940"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4940\/revisions"}],"predecessor-version":[{"id":4942,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4940\/revisions\/4942"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=4940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=4940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=4940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}