{"id":4846,"date":"2020-07-13T17:23:11","date_gmt":"2020-07-13T17:23:11","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/closurenotices\/?p=4846"},"modified":"2020-07-13T17:23:14","modified_gmt":"2020-07-13T17:23:14","slug":"7-16-7-18-planned-power-outages-with-limited-impacts","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/07\/13\/7-16-7-18-planned-power-outages-with-limited-impacts\/","title":{"rendered":"7\/16 &#8211; 7\/18: Planned power outages with limited impacts"},"content":{"rendered":"\n<p>A\u00a0planned\u00a0power\u00a0service interruption will occur on\u00a0Thursday, July 16, beginning at 5 a.m. and last through Saturday, July 18, at 12 p.m. The work to be performed by Pacific\u00a0Power\u00a0includes replacing switches and cables that feed certain buildings along Southwest Jefferson Way and Southwest Campus Way. See below for a list of affected buildings.<\/p>\n\n\n\n<p>For staff using remote desktop, IT is working to ensure limited interruptions to work.<\/p>\n\n\n\n<p><strong>Impacted Buildings: SW Jefferson Way<\/strong><\/p>\n\n\n\n<p>The following buildings will be without&nbsp;power&nbsp;for the duration of the outage (<strong>Thursday, July 16, beginning at 5 a.m. and last through Saturday, July 18, at 7 a.m<\/strong>.):<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Fairbanks Hall<\/li><li>Moreland Hall<\/li><li>Joyce Collin Furman Hall<\/li><li>Hattie Redmond Women and Gender Center<\/li><li>Gladys Valley Gymnastics Center<\/li><\/ul>\n\n\n\n<p>The following building will be without power during the outage, and critical systems will be running on backup power:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Pharmacy Building<\/li><\/ul>\n\n\n\n<p>The following buildings will experience limited electrical service interruptions and will be without&nbsp;power&nbsp;for approximately two hours at the start of the project (Thursday, July 16 from 5 to 7 a.m.) and two hours at the end of the project (Saturday, July 18 from 5 to 7 a.m.):<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Buxton Hall&nbsp;<\/li><li>Callahan Hall<\/li><li>Cauthorn Hall<\/li><li>Hawley Hall<\/li><li>Heckart Lodge<\/li><li>Kerr Administration Building<\/li><li>Langton Hall<\/li><li>McAlexander Fieldhouse<\/li><li>McNary Dining Hall<\/li><li>McNary Hall<\/li><li>Poling Hall<\/li><li>Reed Lodge<\/li><li>Snell Hall<\/li><li>Waldo Hall<\/li><li>Weatherford Hall<\/li><li>West Dining Hall<\/li><li>Wilson Hall<\/li><\/ul>\n\n\n\n<p><strong>Impacted Buildings \u2013 SW Campus Way<\/strong><\/p>\n\n\n\n<p>In addition, there will be a planned power outage on&nbsp;<strong>Saturday,&nbsp;July 18, starting at 5 a.m. and lasting for approximately eight hours<\/strong>. Pacific Power will be replacing bolted connections in a niche that supplies many buildings along SW Campus Way.&nbsp;<\/p>\n\n\n\n<p>The following buildings will be without power during the outage:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Merryfield Hall<\/li><li>Graf Hall<\/li><li>Batcheller Hall<\/li><li>Covell Hall&nbsp;<\/li><li>Kidder Hall&nbsp;<\/li><li>Bexell Hall&nbsp;<\/li><li>Milne Computer Center<\/li><li>Community Hall<\/li><\/ul>\n\n\n\n<p>The following buildings will experience limited electrical service interruptions and will be without power for approximately two hours at the start of the project (Saturday, July 18 from&nbsp;5 to 7 a.m.) and two hours at the end of the project (Saturday, July 18&nbsp;from 10 a.m. to 12 p.m.):<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Rogers Hall<\/li><li>Dearborn Hall<\/li><li>Milam Hall<\/li><li>Gilbert Hall Addition<\/li><li>Gleeson Hall<\/li><li>Gilkey Hall&nbsp;<\/li><\/ul>\n\n\n\n<p>We apologize for any inconvenience that may occur temporarily during these important\u00a0power\u00a0grid improvements. The university\u2019s\u00a0<a href=\"https:\/\/powergrid.oregonstate.edu\/\">Power\u00a0Grid Updates website<\/a>\u00a0has the latest updates, Pacific Power\u2019s COVID-19 safety measures and frequently asked questions about\u00a0planned\u00a0updates and service interruptions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A\u00a0planned\u00a0power\u00a0service interruption will occur on\u00a0Thursday, July 16, beginning at 5 a.m. and last through Saturday, July 18, at 12 p.m. The work to be performed by Pacific\u00a0Power\u00a0includes replacing switches and cables that feed certain buildings along Southwest Jefferson Way and Southwest Campus Way. See below for a list of affected buildings. For staff using remote&hellip; <a href=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/07\/13\/7-16-7-18-planned-power-outages-with-limited-impacts\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3122,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-4846","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/3122"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=4846"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4846\/revisions"}],"predecessor-version":[{"id":4847,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4846\/revisions\/4847"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=4846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=4846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=4846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}