{"id":4791,"date":"2020-06-24T21:39:06","date_gmt":"2020-06-24T21:39:06","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/closurenotices\/?p=4791"},"modified":"2020-06-24T21:39:19","modified_gmt":"2020-06-24T21:39:19","slug":"6-26-2020-research-way-lab-building-fire-alarm-testing","status":"publish","type":"post","link":"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/06\/24\/6-26-2020-research-way-lab-building-fire-alarm-testing\/","title":{"rendered":"6\/26\/2020: Research Way Lab Building fire alarm testing"},"content":{"rendered":"\n<p>As part of the\u00a0Research Way Lab Building\u00a0Renovation Project, new fire alarm system horns, strobes, actuators and controls for dampers will be tested. Fire alarm testing will take place on Friday, June 26, 2020, from 8 a.m. to 3:30 p.m., intermittently.<\/p>\n\n\n\n<p>For questions or comments on this closure, contact\u00a0Construction Manager\u00a0<a href=\"mailto:Amy.Keene@oregonstate.edu\">Amy Keene<\/a>\u00a0at 541-214-1038.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"4792\" data-permalink=\"https:\/\/blogs.oregonstate.edu\/closurenotices\/2020\/06\/24\/6-26-2020-research-way-lab-building-fire-alarm-testing\/researchwaymap-1-1-1-1\/\" data-orig-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap-1-1-1-1.png?fit=734%2C584&amp;ssl=1\" data-orig-size=\"734,584\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"researchwaymap-1-1-1-1\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap-1-1-1-1.png?fit=734%2C584&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap-1-1-1-1.png?resize=551%2C438&#038;ssl=1\" alt=\"Research Way Lab Building area map\" class=\"wp-image-4792\" width=\"551\" height=\"438\" srcset=\"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap-1-1-1-1.png?w=734&amp;ssl=1 734w, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/1905\/files\/2020\/06\/researchwaymap-1-1-1-1.png?resize=300%2C239&amp;ssl=1 300w\" sizes=\"auto, (max-width: 551px) 100vw, 551px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>As part of the\u00a0Research Way Lab Building\u00a0Renovation Project, new fire alarm system horns, strobes, actuators and controls for dampers will be tested. Fire alarm testing will take place on Friday, June 26, 2020, from 8 a.m. to 3:30 p.m., intermittently. For questions or comments on this closure, contact\u00a0Construction Manager\u00a0Amy Keene\u00a0at 541-214-1038.<\/p>\n","protected":false},"author":9928,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3353,211865,1291407],"tags":[],"class_list":["post-4791","post","type-post","status-publish","format-standard","hentry","category-buildings","category-fire-alarm-testing","category-research-way-lab-building"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/users\/9928"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/comments?post=4791"}],"version-history":[{"count":1,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4791\/revisions"}],"predecessor-version":[{"id":4793,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/posts\/4791\/revisions\/4793"}],"wp:attachment":[{"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/media?parent=4791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/categories?post=4791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.oregonstate.edu\/closurenotices\/wp-json\/wp\/v2\/tags?post=4791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}