As part of the Nash Hall Elevator project, the southwest elevator in Nash Hall will be out of service starting on Monday, Aug. 9 through Thursday, Aug. 12, 2021. The northeast elevator in Nash Hall will remain in service during this work. Work includes code-required modifications to fire sprinkler heads and associated electrical systems, which necessitates the temporary shutdown of the water to the fire suppression system and temporary disabling of associated alarms. A final elevator inspection is scheduled for Wednesday, Aug. 11, 2021. 

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map

UPDATED: As part of the Nash Hall Elevator project, a sprinkler head needs to be removed, which requires the temporary shutdown of the water to that system as well as temporarily disabling the associated alarms at Nash Hall. Work is scheduled to take place all morning on Friday, April 9, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780 or contractor Jonathan Fisher, with Ausland Group, at 541-450-2774.

Nash Hall area map

As part of the Kerr Fire Alarm Replacement project, in order to facilitate the installation of the new fire alarm system in Kerr Administration Building, building power will be shut off on Saturday, Jan. 30, 2021, from 8 a.m. to 3 p.m.

For questions or comments on this closure, contact Construction Manager Lindsey Austin at 541-990-7720.

Kerr Administration Building area map

As part of the Research Way Lab Building renovation project, on Monday, May 4, 2020, the electrical sub-contractor, EC, will be shutting down the fire alarm panel from 7 a.m. to 12 p.m., to re-route the existing fire alarm to make room for the new panel. Andersen Construction will be providing fire watch throughout the building during this period. Occupants will be notified once the existing system is back online.

For questions or comments on this closure, contact Construction Manager Amy Keene at 541-214-1038 or Project Manager John Doty at 541-740-8302.

Map of Research Way Lab Building location