Effective Date(s):

  • Lot restriping: Wednesday, August 9 & Thursday, August 10
  • ADA/reserved parking space closures & sidewalk impacts: August 9 through December 31


As part of the Jen-Hsun & Lori Huang Collaborative Innovation Complex project, the south-west section of the Park Terrace St. East parking lot, located just north of Plageman Hall, will be closed for restriping and construction prep work.

This is a two-part closure. The restriping work will occur on Wednesday, August 9 and Thursday, August 10. The impacted section of the parking lot will then reopen. The second closure will impact the ADA and reserved parking spaces closest to Plageman and will be in effect through December 31. This section will be enclosed with construction fencing, which will extend onto the sidewalk on the east side of SW Park Terrace Place.

The construction fencing enclosure will obstruct a small section of the sidewalk on either side of the first parking lot entrance north of Plageman. The walkway along the north side of Plageman, bordering the ADA parking spaces, will also be closed through December 31.

For questions or comments on this closure, contact Project Manager Dustin Sievers at (541) 760-6240 or Construction Manager Jason Lundy at (541) 270-0193.

Scheduled: Fire Alarm & Sprinkler Testing

Effective Date(s): July 31st-August 4th, 2023

Convergint will be conducting annual fire alarm & sprinkler testing.  Testing will take place in the buildings listed below.  The testing will be brief and include both sounding of alarms and strobes. As part of the testing building occupants may notice occasional beeping coming from the fire panel and horns and strobe lights activating throughout the building.  Signage will be posted on exterior doors while testing is being conducted.

July 31st

  • Gleeson Hall
  • Wiegand Hall
  • Bexell Hall

August 1st

  • Langton Hall
  • Moreland Hall
  • Waldo Hall

August 2nd

  • Covell/Batcheller
  • Dearborn Hall
  • Rogers Hall

August 3rd

  • Gilbert Hall
  • Gilbert Hall Addition
  • Graf Hall

August 4th

  • Linus Pauling
  • Plageman Student Health Center
  • Weniger Hall

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Monday, June 26 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.

The image shows a sidewalk closure on the north side of the Kelley Engineering Center, between Kelley Engineering and the Plageman Student Health Center.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

As part of Kelley District Utility Plant project, the sidewalk between the Kelley Engineering Center and the Plageman Student Health Center will be closed on Monday, June 19 from 6 A.M. to 6 P.M. Other possible impacts include noise and concrete dust near the construction site. ADA access to all buildings in the area will be maintained.

The image shows a sidewalk closure on the north side of the Kelley Engineering Center, between Kelley Engineering and the Plageman Student Health Center.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740-5260.

Pacific Power is scheduling a power outage to make immediate repairs to equipment in an underground vault outside student health. The outage will begin Sunday morning April 2, 2023 beginning at 5:00 am with an estimated completion time of 8 am.  Please see the list of impacted buildings below. These buildings will be closed to the public during the outage.

 Affected buildings:

  • Plageman Student Health Center
  • Weniger Hall

What do you need to do to prepare for this outage? Please make sure that all computers, printers, copiers, and other electronic devices are turned off prior to Sunday,  April 2nd. If you have an Uninterruptable Power Supply (UPS), also known as a battery back-up, please be sure to turn it off as well. The building will not have network connectivity during this power outage, i.e. no wireless, wired internet or VoIP phone connectivity. Anything that relies on the network will not be functional.

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing.

Week of July 4th

  • Reser Stadium
  • Merritt Truax Indoor Center
  • Magruder Hall Onan
  • Magruder Hall Generac

Week of July 11th

  • Cascade Hall
  • Dryden Hall
  • Lab Animal Resources Center
  • George W. Peavy Forest Science Center
  • Richardson Hall

Week of July 18th

  • Energy Center
  • Precision Agricultural Systems Center
  • RAIL

Saturday July 23rd

  • Nash Hall & Linus Pauling Science Center
  • Agricultural & Life Sciences Building

Week of July 25th

  • Hallie E. Ford Center
  • Kelly Engineering Center
  • Johnson Hall
  • Plageman Student Health Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns, and Detours page for updates on this and other campus closures.

Please forward this notice to anyone who would benefit from this information.

_____________________________

Facilities Services

University Facilities, Infrastructure & Operations

Oregon State University

830 SW 35th Street | Corvallis, OR 97331 | 541-737-2969

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing.

Week of July 5th

  • Reser Stadium
  • Merritt Truax Indoor Center
  • Magruder Hall Onan
  • Magruder Hall Generac
  • Dryden Hall

Week of July 12th

  • Cascade Hall
  • Lab Animal Resources Center
  • George W. Peavy Forest Science Center
  • Richardson Hall

Week of July 19th

  • Energy Center
  • Precision Agricultural Systems Center
  • RAIL
  • Austin Hall
  • Learning Innovation Center

Saturday July 24th

  • Nash Hall & Linus Pauling Science Center
  • Agricultural & Life Sciences Building

Week of July 26th

  • Hallie E. Ford Center
  • Kelly Engineering Center
  • Johnson Hall
  • Plageman Student Health Center

For questions or comments on this notice contact, Facilities Services at 541-737-2969.