As part of the Kelley District Utility Plant project, there will be intermittent traffic impacts on SW Campus Way due to tree trimming activity on Saturday, August 26 from 8 A.M. to 10 A.M. The location of the work will be between SW Memorial Place and SW 26th Street., near Milam Hall and Kelley Engineering Center. The equipment blocking the roadway will move to accommodate vehicle traffic and allow for emergency access to the area.

Both the north and the south sidewalks on Campus Way will remain open for pedestrians. Other possible impacts include noise near the work site.

The map shows an area marked for tree trimming activity on SW Campus Way between SW Memorial Place and SW 26th St.

For questions or comments on this closure, contact Construction Manager Justin Fuszek at (541) 740 – 5260.

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing. 

Week of August 1st  

  • Milam Hall 
  • Burt Hall 
  • Dearborn Hall 
  • Milne Computer Center 

Week of August 8th  

  • The Valley Library 
  • Pharmacy Building 
  • Kerr Administration Building  
  • Kerr Administration Building Telecom 

Week of August 15th  

  • Sinnhuber Aquatic Research Lab 
  • Salmon Disease Lab #1 
  • Research Way Building 

Week of August 22nd 

  • Portable Generator #3 
  • Portable Generator #4 

For questions or comments on this notice contact, Facilities Services at 541-737-2969. 

Closures are often subject to changes and delays, so please visit the OSU Campus Closures, Shutdowns, and Detours page for updates on this and other campus closures. 

Please forward this notice to anyone who would benefit from this information. 

_____________________________ 

Facilities Services 

University Facilities, Infrastructure & Operations 

Oregon State University 

830 SW 35th Street | Corvallis, OR 97331 | 541-737-2969 

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing. 

Week of August 2nd  

  • Milam Hall 
  • Burt Hall 
  • Dearborn Hall 
  • Milne Computer Center 

Week of August 9th  

  • The Valley Library 
  • Pharmacy Building 
  • Kerr Administration Building  
  • Kerr Administration Building Telecom 

Week of August 16th  

  • Sinnhuber Aquatic Research Lab 
  • Salmon Disease Lab #1 
  • Research Way Building 

Week of August 23rd  

  • Portable Generator #3 
  • Portable Generator #4 

For questions or comments on this notice contact, Facilities Services at 541-737-2969. 

As part of the Milam Hall re-roofing project, a lift will be set up adjacent to Milam Hall for the roof design team to gain access to the roof starting at 9 a.m. on Thursday, April 15, 2021. Work will continue through Friday, April 16, 2021.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at 541-207-2780.

Milam Hall area map