As part of the OSU Cycling Club’s Beaver Criterium, the following parking lots and streets will be closed and/or blocked on Sunday, July 30, 2017, from 6:00 am through 6:00 pm.

 

 

 

  • Kerr Administration West Lot (3263)
  • Jefferson Way between Benton Place and 26th Street
  • S Benton Place (3268)
  • Coleman Field East Lot (3261)
  • Waldo Hall South Lot (3266)
  • Langton Place (3254)
  • Navy ROTC Lot (3265)
  • Dixon Rec Center East Lot (3269)
  • South 26th Street, Dixon Meters (3300)
  • Waldo Place between Jefferson Way and Campus Way
  • Benton Place between Jefferson and Washington Way
  • Washington Way between Benton Place and 26th Street
  • 26th Street between Jefferson and Washington Way.

For questions or comments on this closure, contact Mitch Wiltbank, (208) 691-7292.

As part of the 30th Street Storm Sewer Renewal project, 30th Street southbound from Jefferson Way to Washington Way will be closed starting on Monday, July 24, 2017 through Friday, August 25, 2017. This closure will be in effect 24-hours a day during the duration of this project. This project may create disruptive noise, dust and/or mud.

For questions or comments on this closure, contact Rick Freeman at 541.231.5368.

As part of the Cordley Hall re-roofing project, a crane will be blocking Campus Way just south of Cordley Hall from July 19, 2017 – July 21, 2017. This portion of the street is a dead end and should not be regularly traveled except for service vehicles parking in this location. There will be intermittent disruptive noise for this event.

For questions or comments on this closure, contact Dustin Sievers at 541.760.6240.

2017 West Campus Street Closure Coordination (Multiple Projects):

Beginning in May 2017, OSU will begin construction of three time sensitive projects on the west side of campus, which will require lane closures and/or detours.  Specific areas of impact include Jefferson Way between 30th and 35th, Campus Way between 30th and 35th, and 30th Street between Washington Way and Jefferson Way.  Estimated durations and scopes of the work can be found in the attached image.  Date specific closure and detour notifications will be sent out as contractor schedules are coordinated, refined, and approved by emergency services.

 

Brief project summaries:

Campus Way Conduits – provides telecom backbone from campus utility tunnel to ASMC building west of 35th.

Utility Tunnel and Jefferson Improvements – provides for a new steam/utility tunnel and road reconstruction and realignment of Jefferson Way.

30th Street Storm Renewal – provides drainage and pavement improvements to mitigate standing water and pavement failures on 30th.